Master Calculation Worksheet
Complete this worksheet for each site in your enterprise. All inputs flow from previous chapters. Fill in your values, run the formulas, and read the verdict.
Site identification
| Field |
Your value |
| Site name |
___ |
| Location |
___ |
| AI workloads deployed |
___ |
| WAN link type |
___ |
| Design date |
___ |
| Designed by |
___ |
Block 1 — U_eff (Chapter 2)
U_eff = (H × 1.0) + (AI × 3.5) + (IoT × 0.2) + (Pod × 7.0)
| Variable |
Count |
Multiplier |
Contribution |
| Human operators (H) |
___ |
× 1.0 |
= ___ |
| AI software agents (AI) |
___ |
× 3.5 |
= ___ |
| IoT / edge sensors (IoT) |
___ |
× 0.2 |
= ___ |
| GPU inference pods (Pod) |
___ |
× 7.0 |
= ___ |
| U_eff |
|
SUM |
= ___ |
Block 2 — AIW (Chapter 2)
AIW = Σ(stream_Mbps) × Burst_factor
| AI stream |
Active? |
Mbps |
| Speech-to-text |
Y / N |
___ |
| LLM / agent assist |
Y / N |
___ |
| Screen analytics |
Y / N |
___ |
| Vision / camera AI |
Y / N |
___ |
| RAG / knowledge base |
Y / N |
___ |
| Fraud / real-time inference |
Y / N |
___ |
| Other: ___ |
Y / N |
___ |
| Subtotal |
|
= ___ |
| × Burst factor |
|
× ___ |
| AIW |
|
= ___ Mbps |
Block 3 — CS (Chapter 3)
CS = PII + Regulatory + Exposure + Model_sensitivity + Financial
| Component |
Score (0, 0.5, or 1.0) |
| PII handling |
___ |
| Regulatory scope |
___ |
| Public / partner exposure |
___ |
| AI model sensitivity |
___ |
| Financial / payment data |
___ |
| CS total |
= ___ |
CS overhead fraction (from table):
| CS |
Overhead |
| 1.0 |
8% |
| 2.0 |
18% |
| 3.0 |
28% |
| 4.0 |
40% |
| 5.0 |
60% |
CS overhead fraction for your CS: ___ %
Block 4 — LL (Chapter 3)
RTT_total = 2 × (Access + Core + Firewall + WAN + LB) + Inference + Jitter
Headroom = LL_budget − RTT_total
| LL selected |
RTT budget |
| LL = 1 |
500 ms |
| LL = 2 |
200 ms |
| LL = 3 |
80 ms |
| LL = 4 |
31 ms |
| LL = 5 |
20 ms |
Your LL: ___ | Your RTT budget: ___ ms
| RTT component |
Current (ms) |
Target (ms) |
| Access switch |
___ |
___ |
| Core / distribution |
___ |
___ |
| Firewall / NGFW |
___ |
___ |
| WAN / internet |
___ |
___ |
| Load balancer |
___ |
___ |
| AI inference |
___ |
___ |
| Jitter buffer |
___ |
___ |
| RTT total |
= ___ |
= ___ |
| Headroom |
= ___ |
= ___ |
Required architecture (from LL table): ___
Block 5 — Bandwidth B (Chapter 4)
B_minimum = (U_eff × AIW × Peak_factor) / Link_utilisation_target
B_recommended = B_minimum × 1.5
Model_sync_BW = GB × Updates/day × 8000 / 86400
B_total = B_recommended + Model_sync_BW
| Variable |
Your value |
| U_eff |
___ (from Block 1) |
| AIW |
___ Mbps (from Block 2) |
| Peak_factor |
___ (1.5–2.5) |
| Link_utilisation_target |
___% |
| B_minimum |
= ___ Mbps |
| B_recommended |
= ___ Mbps |
| Model size (GB) |
___ |
| Updates per day |
___ |
| Model_sync_BW |
= ___ Mbps |
| B_total to provision |
= ___ Mbps (___ Gbps) |
| Current B |
___ Mbps |
| B_gap |
= ___ Mbps |
Block 6 — IS Calculation (Chapter 5)
IS = (U_eff × AIW × CS × LL) / (B × A)
| Variable |
Value |
| U_eff |
___ |
| AIW |
___ |
| CS |
___ |
| LL |
___ |
| Numerator (U × AIW × CS × LL) |
= ___ |
| B provisioned |
___ Mbps |
| A factor |
___ |
| Denominator (B × A) |
= ___ |
| IS = Numerator / Denominator |
= ___ |
IS verdict:
Block 7 — PUO (Chapter 5)
| Variable |
Value |
| IS |
___ |
| U_eff |
___ |
| PUO |
= ___ |
PUO verdict:
Block 8 — Required bandwidth for IS = 3
B_required = (U_eff × AIW × CS × LL) / (3.0 × A)
B_gap = B_required − B_current
| Variable |
Value |
| Numerator (from Block 6) |
___ |
| Target IS |
3.0 |
| A factor |
___ |
| B_required (Mbps) |
= ___ |
| B_current |
___ Mbps |
| B_gap |
= ___ Mbps |
| Upgrade factor |
= ___× current |
Block 9 — MCP tier assignment (Chapter 6)
Assign each AI workload to the correct inference tier:
| Workload |
LL req |
CS level |
Assigned tier |
On-prem infra needed |
| ___ |
___ |
___ |
Tier ___ |
___ |
| ___ |
___ |
___ |
Tier ___ |
___ |
| ___ |
___ |
___ |
Tier ___ |
___ |
| ___ |
___ |
___ |
Tier ___ |
___ |
Summary verdict
| Metric |
Your value |
Status |
| U_eff |
___ |
— |
| AIW |
___ Mbps |
— |
| CS |
___ |
— |
| LL |
___ |
— |
| B current |
___ Mbps |
— |
| B required (IS=3) |
___ Mbps |
— |
| B gap |
___ Mbps |
Upgrade / No upgrade |
| IS |
___ |
Optimal / Monitor / Upgrade / Blocker |
| PUO |
___ |
Over / Balanced / Stressed / Overloaded |
| RTT headroom |
___ ms |
Pass / Fail |
| AI Readiness Score |
___ / 100 |
Pass (≥70) / Fail |
| Overall readiness |
|
Ready / Not ready |
Actions required before AI go-live
List each action item with owner and deadline:
| # |
Action |
Owner |
Target date |
Priority |
| 1 |
___ |
___ |
___ |
Critical / Medium / Low |
| 2 |
___ |
___ |
___ |
___ |
| 3 |
___ |
___ |
___ |
___ |
| 4 |
___ |
___ |
___ |
___ |
| 5 |
___ |
___ |
___ |
___ |